Sorry, this position is no longer available. The job posting has expired and we are not accepting new applications at this time.
Looking for other opportunities? Check out our current job openings to find your next career opportunity.
DUE: 10 JUL 2026
Terms of Reference (TORs & Scope of Works)
Name and Code: SCARL-CDS-ZIM7459
Project Title: Scaling Up for Resilient Livelihoods (SCARL) Phase 2
Project Site location: Nyanga, Ward 25
Project Site name: Sadomba Piped Water System
The Salvation Army, an international movement, is an evangelical part of the universal Christian Church. Its message is based on the Bible. Its ministry is motivated by the love of God. Its mission is to preach the gospel of Jesus Christ and to meet human needs in his name without discrimination.
The Salvation Army (TSA) is spread across all provinces of Zimbabwe, with over 52 schools, 3 health centres, 4 social centres for the elderly and destitute, 3 community development programmes focusing on resilience, agriculture, education and economic development. Furthermore, TSA has about 1,000 worship centres which provide Sunday worship services in recognized local languages and fellowship meetings during the week, as well as social care and community outreach programs
The Salvation Army Zimbabwe has been working with 4 districts of Zimbabwean communities for 3 years with the overall goal of strengthening the resilience of livelihood to shocks in the provinces of Manicaland and Mashonaland by diversifying the sources of food security and incomes.
Building on the achievements of the previous phase infrastructure and some gains, this is a follow up three-year project seeks to leverage and recover communities from the effects of El Nino so as to cushion the communities in food security, water supply and incomes and generally improve their resilience to the effects of climate change. It is focusing on value addition to some produce that will be coming from the gardens, honey, dairy produce and market linkages to the farmers in the projects. The proposed next phase of the project (SCARL Phase 2) is also designed based on findings and recommendations from a recently concluded end line evaluation.
3.Overall Goal:
Equitable, sustainable, and resilient food security and income for vulnerable households in four rural districts of Zimbabwe
The water supply system relies on abstracting water from the existing river to the three masonry water storage tanks. The existing infrastructure has deteriorated due to damaged pipes resulting in erratic and unreliable water supply system. The main scope of works includes rehabilitation of water storage masonry tanks and installation of new pipes on the existing main line. The existing main line has been affected by frequent pipe bursts due to wrong sizing and selection of piping materials (size and class). Water from the existing masonry tanks is to be delivered to three separate gardens by gravity however these gardens are yet to be established. The estimated total distance between the water source and the last storage tank is +-14km and each garden must have its own separate water storage tank to easy management.
To rehabilitate and restore the river water abstraction siphoning, transmission, and storage in the tanks infrastructure to ensure a reliable and sustainable water supply for irrigation purposes
6.1 Assessment and Survey
The contractor/consultant shall:
6.2 River Intake Rehabilitation
Works may include:
6.3 Pipeline and Siphon Rehabilitation
6.4 Storage Tank Rehabilitation
6.5 Environmental and Safety Measures
The contractor/consultant shall provide:
The assignment shall be completed within 8 weeks from the date of contract commencement.
The contractor/consultant should:
The contractor/consultant shall report to:
The project will be considered complete when:
It is against this background that Salvation Army seeks the services of the professional contractor to execute the above stated scope of works. Please kindly bear in mind that for this assignment the organization has adopted a three pronged or multistage process where all prospective contractors or bidders are obliged to follow. The procurement stages are indicated below:
| Activity | Date |
| Expression of interest | 22 June 2026 |
| Site Visit | 25 Julne 2026 |
| Submission of bidding Documents | 30 July 2026 |
1.Technical Proposal which include the methodology and work plan
Email hu•••••••••••••@••••••.org with the following specific references:
SCARL-CDS-ZIM7459 Sadomba Piped Water Scheme